Questions before a Power BI report is designed
Ask which decision the report should support, how each measure is defined and which records can substantiate it. Resolve disagreements about dates, populations and ownership before treating a visual as the agreed requirement. Use a recent business example to test the answers.
Microsoft's BI solution planning guidance separates business design from technical validation. It includes metric definitions and source mappings. The questions below are an authored workshop aid, not a specification of Power BI capabilities or licensing.
| Ask the business user | Ask for | Record the unresolved point |
|---|---|---|
| What decision will you make after reading this? | A recent decision and the information used | A chart request with no identified action |
| What does this measure include? | A definition, population and worked calculation | Competing meanings of the same label |
| Which date belongs to the measure? | Examples crossing a period boundary | Order, invoice and payment dates conflated |
| How current must the information be for that decision? | Decision timing and source availability | Desired freshness not yet tested against the source |
| Who may inspect the underlying detail? | An authorised access requirement | Assumed permissions or unreviewed sensitive data |
| What should happen when a source is missing? | A failure example | Whether to suppress, label or hold the result |
Synthetic workshop: “monthly sales”
A sales manager means orders accepted during the month. Finance means invoices issued during the month. Neither total is automatically wrong: the requested decision and definition differ.
Take a fictional order accepted on 30 September and invoiced on 2 October. Ask each person which month should include it and why. Record the proposed measures separately until the decision owner agrees the intended behaviour. Renaming a chart without resolving this boundary can hide the disagreement.
Do the same with cancellations and credit records. Keep an example that should be included and one that should be excluded. Confirm the source can distinguish them before committing to a calculation.
End the session with something testable
Read back each definition and its open questions. Assign a source check to a named owner. Once the definitions are agreed, write expected results for the sample records and link them to the requirements traceability matrix.
Technical design must still test the chosen connection, access and refresh behaviour in the actual environment. A requested refresh interval is a requirement to assess, not evidence that the platform or source will meet it.
Which measure definitions and source assumptions need agreement?
Resolve the decision, metric definitions and evidence gaps in a worked business session.
Your starting question: Which measure definitions and source assumptions need agreement?
Start by checking
- Inspect a decision and period-boundary example.
- Separate competing definitions of monthly sales.
- Assign source and technical checks.
Evidence to gather
- Business definitions and sample source records.
- Access requirements and source availability.
Not established yet
- A requested refresh interval is feasible.
- A product feature is configured correctly.
